The technical passport of a building in Bulgaria: what it is, when it is mandatory and why to ask for it when you buy
Buyers ask about Act 16, the energy certificate and the tax valuation. They rarely ask about the technical passport — yet it is the document that says exactly what was built, what needs repairing and by when, and what must not be done to the building.
Checked as of November 2026.
What the technical passport is
The technical passport is governed by Arts. 176a–176c of the Spatial Development Act (ZUT) and by Ordinance No. 5 of 2006 on the technical passports of constructions. It is drawn up for the whole construction — the building, not a single flat (Art. 3 of the ordinance) — and has three parts (Art. 4):
| Part | What it contains |
|---|---|
| A "Main characteristics" | identification (address, cadastral identifier, year built, later alterations), areas and volumes, number of storeys, services; technical characteristics against the essential requirements; certificates, including the energy one; details of the owner and of the people who prepared it |
| B "Maintenance measures and repair deadlines" | survey results, required major and routine repairs and their deadlines, a schedule of urgent measures |
| C "Instructions for safe use" | no damage to load-bearing elements (cutting openings, removing elements), no change of use that overloads the structure, maintenance of services and lifts |
The passport's registration number matches the building's cadastral identifier (Art. 4(2)).
When it is mandatory
New buildings. A passport is drawn up on completion of every new construction (Art. 176a(1) ZUT) and before it is put into service (Art. 12 of the ordinance). Without it, the building cannot be put into service (Art. 178(3)(1) ZUT) — for the procedure itself see our guide from building permit to entry into use. A "new construction" for the ordinance is a building whose permit was issued after 1 January 2007.
Existing buildings. A passport is drawn up after reconstruction, major renovation, major repair or conversion (Art. 176a(1) ZUT). Since the 2021 amendment of the ordinance (State Gazette No. 68), this happens after a survey, when the works cover the whole building and need a building permit, or affect the structure of part of it (Art. 2(1)(2)).
There is no general deadline for privately owned buildings. The old deadlines by building category were repealed. A deadline remains only for existing buildings in public state and municipal ownership: 31 December 2032 (§ 2(2)). That is why, as we noted in our guide to older panel and brick blocks, most blocks built before 2007 have no passport unless they have been renovated.
No passport is drawn up for illegal constructions, temporary constructions and ancillary outbuildings, or for constructions without a permanent planning status (Art. 2(3)) — for the last group owners may commission one voluntarily.
Who prepares it
- New building, categories one to four — the construction supervision firm, together with its final report (Art. 176b(1) ZUT; Art. 11 of the ordinance).
- New building, fifth category (most single-family houses, for example) — the site's technical manager once the works are complete.
- Existing building — the people who carried out the survey: a licensed consultant or designers with full design rights, whose team must include an engineer qualified for technical control of the structural part; the energy part is done by persons qualified under the Energy Efficiency Act (Art. 176c ZUT).
The survey of an existing building covers collecting the documentation, measured drawings where no designs exist, inspection and measurements, calculation checks and an assessment of seismic safety (Arts. 21–22 of the ordinance). The owners commission it by contract; with co-ownership, some co-owners may commission it at the expense of all (Art. 9).
Where it is kept and what duties it creates
The passport is made in two originals — one for the owner (the commissioning party) and one for the authority that issued the building permit, which keeps a register and an archive (Art. 176a(4)–(5) ZUT; Arts. 15–16 of the ordinance). A certified copy goes to the Geodesy, Cartography and Cadastre Agency.
The owner must keep the passport and follow the instructions in Parts B and C (Art. 17) and, after a survey, draw up a schedule for carrying out the measures (Art. 26). Changes to the building are recorded in the passport (Art. 14(3)).
Why ask for it when you buy
New builds. A building permitted after 2007 must have a passport. Ask the developer or the building manager for a copy. If there is none, that also raises a question about how the building was put into service — see our guide to Act 14, 15 and 16.
What to look at inside:
- Part A — do the areas, number of storeys and use match what you are being sold; are later alterations recorded?
- Part B — which repairs are prescribed and by when. An upcoming roof or facade repair means contributions — check what the general assembly has decided and what is in the repair fund.
- Part C — what is not allowed. If you plan to cut an opening in a wall or join rooms, the passport is the first place to check the limits.
Houses. For a house built under a permit issued after 2007, the passport was prepared by the technical manager and the seller should have it. Older houses usually have none, but a survey can be commissioned at any time at the owner's request (Art. 20(2)) — useful before a major renovation or adding a storey.
An older block with no passport. Here, the absence of a passport is normal and is not a breach in itself. Rely instead on your own inspection with a structural engineer.
In short
- The passport has three parts: characteristics (A), repairs and deadlines (B), instructions for use (C).
- It is mandatory for every new building (permit after 1 Jan 2007) before it is put into service, and after reconstruction, major renovation, major repair or conversion.
- For privately owned existing buildings there is no general deadline; for state and municipal ones it is 31 Dec 2032.
- It is prepared by the construction supervisor or the technical manager (new buildings) or by the people who carried out the survey (existing ones).
- When buying, check Part B (upcoming repairs) and Part C (what cannot be changed).
If you are buying a new or renovated home and are not sure which documents the building should have, call us or visit our office. We will request the passport and the building papers and go through them with you.
Checked as of November 2026. This is general information and does not replace advice from a designer, consultant or lawyer.