Renovating a flat in a Bulgarian apartment block: what needs no permit, when you need a building permit, and what you owe your neighbours
18 October 2026

Renovating a flat in a Bulgarian apartment block: what needs no permit, when you need a building permit, and what you owe your neighbours

Most renovation work inside a flat needs no paperwork from the municipality. There is, however, a clear line beyond which the work becomes "construction" in the legal sense, and without a permit it is unlawful. Here is where that line runs and what else you have to respect when you live in an apartment block.

What you can do without a permit: "routine repair"

Under Art. 151(1)(1) of the Spatial Development Act (ЗУТ), no building permit is required for routine repair (текущ ремонт) of buildings and installations. The Act defines routine repair (§ 5, item 43 of its Additional Provisions) as improving and maintaining the building in good order, including internal alterations that:

  • do not affect the building's structure;
  • do not remove or move walls or create openings in them where this affects the structure;
  • do not change the use of the rooms or the loads on them.

In practice this covers painting and plastering, new flooring and tiles, new sanitary ware, electrical and plumbing work inside the flat, new windows and doors, a new kitchen and built-in furniture, and moving light (non-load-bearing) partition walls.

Art. 151(1)(6) also expressly exempts glazing in balconies and loggias from the permit requirement. For listed cultural heritage buildings and their protection zones, even this work must be cleared under the Cultural Heritage Act (Art. 151(2)).

When you need a design and a building permit

As soon as the work affects the structure (a load-bearing wall, column, beam or floor slab) it is no longer routine repair. It becomes an alteration, a major repair (§ 5, item 42) or a reconstruction (§ 5, item 44), and the general rule applies: construction may only be carried out if permitted (Art. 148(1)), with the permit issued by the municipality's chief architect (Art. 148(2)).

Typical examples:

  • cutting or widening an opening in a load-bearing wall, often to open the kitchen into the living room;
  • removing a wall that turns out to be load-bearing or to support a slab;
  • cutting through a floor slab for a staircase or a new vertical riser;
  • changing the loads, for example a heavy masonry wall, a hot tub or thick screeds on an old slab;
  • merging a balcony with a room by removing the wall section under the window.

Work done without a permit is unlawful construction (Art. 225(2)(2)) and can be stopped and ordered removed. It also causes trouble when you sell. Banks and notaries look at the documents, and a gap between the approved drawings and what is actually there becomes a point of dispute.

Why a structural engineer comes first

Whether a wall is load-bearing cannot be judged by eye. It depends on the building's structural system. Before anyone picks up a hammer, get a site visit and a written opinion from a fully licensed structural engineer. If they confirm that the wall is not load-bearing and the loads do not change, the work stays routine repair. If not, they will prepare the structural part of the design needed for the permit.

For a change of use (office, practice, shop), Art. 38(7) expressly requires a reasoned structural engineer's opinion. See our guide to change of use.

The condominium: when you need consent

Load-bearing walls, floor slabs, columns, external walls, the roof and the main lines of the installations are common parts of the building (Art. 38 of the Property Act). Any alteration that touches them therefore needs the neighbours' consent as well as a permit:

  • No consent from the other owners is needed when the use does not change, no common areas are taken over and the common parts are not substantially altered, among other conditions (Art. 185(1) ЗУТ).
  • In all other cases you need a decision of the general meeting of owners and the express written consent of all immediate neighbours. Where common parts are taken over, you need the consent of all owners with notarised signatures (Art. 185(2)).
  • Repair, reconstruction and alteration of the common parts themselves require a decision of the general meeting (Art. 48(1) of the Condominium Management Act, ЗУЕС).

Even routine repair is subject to ЗУЕС. An owner must not damage other units or the common parts, and must not impair the architectural appearance, load-bearing capacity or fire safety of the building (Art. 6(1), items 2 and 5). This applies to balcony glazing and window replacement too: neither needs a permit, but neither should change the façade arbitrarily. It is good practice to tell the building manager and your neighbours in advance.

Noise: the hours in Sofia

In Sofia, the City Council ordinance on public events, municipal property and noise in residential buildings bans noise from construction and repair work on working days between 22:00 and 08:00 and between 14:00 and 16:00 (Art. 19(1)). On weekends and public holidays noisy work is banned altogether unless the affected residents agree (Art. 19(2)).

The fine for an individual is €51 to €102, and the penalty for a company is €102 to €204 (Art. 29(1)). Other municipalities have their own ordinances, so check yours.

Construction waste

According to Sofia Municipality:

  • Waste from small household repairs (toilet bowls, tiles, bricks, flooring offcuts, old windows and doors) may be left next to the household-waste containers the day before the scheduled collection in your district. Schedules are published by the Sofia Municipal Inspectorate and on waste.sofia.bg.
  • For a larger renovation you must hire a specialised skip from a private company that holds a permit under the Waste Management Act.
  • Dumping in unauthorised places can be reported to the Municipal Inspectorate.

If the skip has to stand on a pavement or street, check with the district administration beforehand whether a permit is needed and on what terms.

Damage to neighbours and insurance

A leak into the flat below is the most common renovation dispute. Under ЗУЕС, an owner must compensate damage caused to other units while fixing faults in their own (Art. 6(1)(14)). After an alteration under Art. 185 ЗУТ, the owner must repair all damage caused by the works (Art. 185(6)). Check whether your home policy covers third-party liability and what cover your contractor carries. There is more in our guide to home insurance.

Payments and paperwork

Sign a written contract with the contractor covering scope, timeline, price and warranty, and keep the invoices and handover records. The Ministry of Finance has proposed that payments in construction be made only by bank transfer from 2027. For now this is a draft, not a rule in force; details are in our news piece.

Quick checklist before you start

  • Does the work touch a load-bearing wall, slab or column? Get a structural engineer's opinion.
  • If yes: design, building permit, general-meeting decision and neighbours' consent (Art. 185 ЗУТ).
  • Is the building listed, or in a heritage protection zone?
  • Have the building manager and neighbours been told the schedule?
  • Working hours outside the banned periods; weekends only with consent.
  • Skip hire or the collection schedule for small amounts of waste.
  • Written contract, bank payments, insurance.

This article is general information, not legal or technical advice for a specific case. Verified October 2026.

If you are planning a renovation before selling, or buying a flat that has already been altered, call us or visit our office. We will go through the documents with you and tell you what to check.