A power line, gas pipeline or water main across your property in Bulgaria: when the easement arises, what compensation is owed and what you can do in the strip

A power line, gas pipeline or water main across your property in Bulgaria: when the easement arises, what compensation is owed and what you can do in the strip

A pylon in the field, a "Gas pipeline" sign by the fence, a cable under the yard. Owners usually find out about a network once it is already there – or when a letter about compensation arrives from the municipality. Then there are three questions: should I have been asked, how much am I owed, and what can I do from now on.

This guide takes the view of the owner of a property that is already affected. The rules are most detailed for energy facilities – power lines, gas pipelines and heating mains – so we start with those.

When an energy easement arises

Under Art. 64 of Bulgaria's Energy Act, when a linear energy facility is built or extended, easements arise in favour of the company that will build and operate it. They include the right of passage for people and equipment and restrictions on the use of the land within a defined strip – the easement zone.

What is not a condition matters: your signature. The easement arises by operation of law once two conditions are met:

  1. a detailed development plan (PUP) in force, fixing the location and size of the zone, and
  2. compensation paid or deposited for the owner.

So do not ignore notices about a plan being prepared for a route (usually a parcel plan). That is the moment to see exactly where the line will run. Later, any dispute practically comes down to the amount of compensation.

A change of owner does not end the easement – it binds every subsequent buyer.

Compensation: two routes

Art. 64(6) of the Energy Act gives two options:

By agreementUnder Art. 210 of the Spatial Planning Act
Who sets the amountYou and the companyA commission appointed by the mayor
BasisMarket valuation by an independent appraiserMarket prices; the municipality may also use a licensed appraiser
If you disagreeYou do not sign – the planning-act procedure appliesYou appeal the amount to the administrative court

With an agreement, do not sign for a figure before you have seen the valuation. It is the legal basis of the contract and your argument in negotiation.

Under the administrative route, the commission's decision is notified to the owners. The deadline for appeal is 14 days from the notice – lodged through the municipality with the administrative court (Art. 215 of the Spatial Planning Act). Only the amount of compensation can be challenged, not the location or width of the zone. An appeal does not stop the easement from arising.

How to collect the money

Often the company deposits the amount in a municipal account rather than paying you directly. In that case the owner applies to the municipality with:

  • an identity document and proof of ownership;
  • a bank account confirmed by the bank;
  • a current certificate of heirs, if the owner has died;
  • a power of attorney, if you do not apply in person.

In the 2023 example of Vratsa municipality, heirs had to appoint one representative and one account, and dividing the money among them was their own affair. If you are heirs to farmland whose inheritance has not been sorted out, get the paperwork in order in good time – compensation is not paid out automatically.

Compensation is one-off. A buyer of land with an existing easement should not expect a second payment for the same route.

Registration and the cadastre

Art. 64a of the Energy Act provides for registration in the Property Register: the order approving the plan is registered together with the valuation and proof that compensation was paid or deposited. The zone is then shown on the cadastral map as a restriction. This way the easement appears in a property-register search and on the cadastral sketch. How to read areas and data from the cadastre is explained in our guide to a property's floor area.

What you can and cannot do in the zone

The regime is set by Ordinance No. 16 on easements of energy facilities. The width of the zone depends on the type and voltage of the facility and is set out in the ordinance's annexes; the zone that applies to you is the one in the plan.

Under an overhead power line nothing may be built, no perennial trees planted, no vehicles parked and no waste stored. Farming, however, remains yours. With the holder's written consent you may run a pipe or cable through the zone or temporarily store the harvest from it (Art. 14(2)).

Over a gas pipeline on farmland only annual crops with shallow roots are allowed, with no tillage deeper than 0.5 m (Art. 20).

The company has duties too (Art. 15 for power lines, with equivalents for gas and heat):

  • to restore the land after construction and repairs and remove the waste;
  • to hand over cut timber to the owner or user of the land;
  • to align planned maintenance with the harvest.

If crops or property are destroyed during works, damages are claimed from the company under the general rules. Photograph the condition before and after the works and keep the correspondence.

Older lines

Many power lines and pipes were built before the current law. Ordinance No. 16 expressly also applies to easements that arose under the previous Energy Act (Art. 1(2)), but those facilities do not need a plan under the current procedure (Art. 2(3)). In practice such a line often has no registration and it is unclear whether and when compensation was paid. Whether anything can be claimed today depends on the history of the specific facility – a question for a lawyer with the documents in hand.

The owner cannot "move" the easement unilaterally. If the line is in the way of a future building, ask the company in writing for its conditions for relocation – the technical solution and costs are agreed with it.

A neighbour's connections, and water mains

When a neighbouring property connects to power, water or sewerage across yours, Art. 193 of the Spatial Planning Act applies. The preferred route is a contract with notarised signatures; without consent the right is granted administratively only where the law's conditions are met. Do not sign without the route and responsibility for repairs being described.

For water and sewer mains, the specific restrictions are in the approved plan and the project. Ask the municipality and the water utility for them before you plan a fence, a pool or a building near the route.

When selling or buying

  • Seller: prepare the contract or order, the sketch of the zone and proof of compensation received. Open information builds trust and shortens negotiations.
  • Buyer: check the property-register file, the sketch and the plan, and walk the land looking for pylons, manholes and signs. Our full checklist is in legal checks before buying.

In brief

  • An energy easement arises without your consent – once the plan is in force and compensation is paid or deposited.
  • Compensation is set by agreement on an independent valuation, or by a municipal commission; the amount can be appealed within 14 days.
  • If the money was deposited with the municipality, you have to claim it yourself.
  • Farming remains possible in the zone; building and perennial trees do not.
  • For older lines, your rights depend on the facility's history – check the documents.

Give us a call

If a network runs, or will run, across your property – or you are buying a plot with such a strip – call us or visit our office. We will go through the documents and tell you what it means for the price and for future building.

The information is general and indicative and does not replace professional advice.