Splitting a plot before selling in Bulgaria: minimum sizes, amending the regulation plan and when you can sell only part

Splitting a plot before selling in Bulgaria: minimum sizes, amending the regulation plan and when you can sell only part

You own a large plot and want to sell only part of it — or you have inherited it and each heir wants "their piece". "I'll sell 400 sq m of my 900" sounds simple, but Bulgarian law does not let you sell a physical part of a plot with a notarial deed alone. A separate property has to be created first, by amending the detailed development plan.

If you are co-owners and the question is who gets what, we covered the general rules on dividing property and selling a share in our guide to co-owned and inherited property. This guide is about the plot itself — what the Spatial Development Act (ZUT) allows.

An undivided share or a physical part

An undivided share (say, 1/2) can be sold at any time without changing the plan, but the buyer becomes a co-owner of the whole plot, not the owner of a defined piece — which most buyers do not want.

A physical part — a specific, marked-out area — is a different matter. Under Article 200(1) ZUT, physically defined parts of land within towns, villages and settlement formations can be acquired by transaction or by prescription only if they meet the minimum sizes in Article 19 ZUT. In practice, the regulation plan is amended first, two (or more) regulated plots (UPI) are created, and only then is each sold as a separate property.

Minimum sizes for low-rise housing

Article 19(1) ZUT sets the minimum frontage (the side facing the street) and the minimum area of a UPI for low-rise residential building:

Where the plot isMinimum frontageMinimum area
Towns and cities14 m300 sq m
Resort settlements, settlement formations and resort zones16 m500 sq m
Villa zones18 m600 sq m
Villages on predominantly flat terrain16 m (14 m in specific conditions and on main streets)500 sq m (300 sq m)
Villages on predominantly steep terrain12 m250 sq m

The municipal council decides which villages count as flat or steep (para. 2). The sizes can be reduced by no more than one fifth on the opinion of the municipal expert council where conditions justify it (para. 3). On division, the physically separated parts likewise cannot be smaller than the minimum reduced by at most 1/5 (para. 4).

For medium- and high-rise building, low-rise linked development across more than two plots, and non-residential uses, sizes are set by the detailed development plan itself (paras. 5 and 6).

Worked example: do you have the metres?

A plot in a town: 700 sq m with 24 m of street frontage. Under the general rule, two new plots need at least 14 m of frontage each — 28 m in total. Not enough. With the maximum one-fifth reduction, the minimum becomes 11.2 m of frontage and 240 sq m per plot — 24 m and 700 sq m would then suffice, but only if the expert council accepts that the reduction is justified. So measure the frontage first, not just the area.

What is already built matters too. ZUT expressly requires the mayor to refuse an owner-requested change to the regulation that would create an unlawful position for existing buildings or permitted construction, or plots below the minimum sizes (Article 15(9) and (10)). Courts apply the same divisibility test in partition cases (Article 201(2)).

The route: amending the regulation plan

  1. Check. Get an up-to-date cadastral sketch, look at the detailed development plan in force, and ask the chief architect's office whether a division is possible.
  2. Request. The owners file a written application to the mayor with a sketch of the proposed change (Article 135(1)–(2) ZUT). Within one month the mayor issues an order allowing or refusing preparation of a draft, based on the chief architect's opinion (paras. 3–4). Where the only interested parties are the applicants themselves, a draft with a reasoned justification can be filed directly, without a separate permission order (Article 135a). A permission order lapses if no draft is filed within one year (Article 135(8)).
  3. Consents. An owner-initiated amendment requires the consent of all owners of the affected properties, as well as holders of limited property rights (such as a right to build or a right of use) and concessionaires (Article 134(2), item 6 ZUT).
  4. Approval. The draft is adopted by the municipal expert council. A plan covering up to one block (up to three in Sofia and cities with districts) is approved by order of the mayor within 14 days of that adoption (Article 129(2) ZUT). The order is notified to interested parties and can be appealed.
  5. Cadastre. The amendment is sent to the Geodesy, Cartography and Cadastre Agency. Only once the new plots appear on the cadastral map does each have its own identifier and sketch for the notarial sale.

Fees are set by each municipality in its local fees ordinance, and the draft is prepared by a licensed designer.

Selling a strip to the neighbour

There is one exception to the minimum-size rule. Article 200(2) ZUT allows a part to be transferred if it is joined to a neighbouring plot, provided your remainder still meets Article 19 (or is also joined to a neighbouring plot).

It takes an application to the municipality and a preliminary contract with notarised signatures (Article 15(3) ZUT for regulated plots; Article 17(2), item 2 and (3) for unregulated ones), and building is permitted only once the final contract is presented (Article 15(7)). The advantage for the seller is that the buyer and the price are settled up front.

An unregulated plot within a settlement

An unregulated plot within a settlement can be regulated by a detailed development plan so as to form several separate UPIs (Article 17(2), item 1 ZUT). If, however, the municipality prepares a plan for a whole area of unregulated land (Article 16 ZUT), the sizes of the new plots are set by the plan and owners transfer up to 25% of their land to the municipality for streets, green space and public facilities.

When the plot is co-owned

In a voluntary division, the physical shares must meet the same minimum sizes. In a court partition of a UPI, the court asks the municipality whether the plot is divisible (Article 201 ZUT). If it is, the chief architect instructs the parties to file a draft amendment to the plan, which applies once the court judgment takes effect. If it is not, the chief architect sends an opinion within 14 days; the court may disagree and issue binding instructions. An indivisible plot is not physically split — it is awarded to one co-owner or sold at public auction, as explained in our co-ownership guide.

If several families are buying a shared plot intending to split it later, see also our guide to building together.

Agricultural land outside settlements

Outside settlements different rules apply. According to guidance from a regional agriculture directorate of the Ministry of Agriculture, on disposal and division agricultural plots cannot be split into parts smaller than the sizes in Article 72 of the Inheritance Act: 3 decares for arable land, 2 decares for meadows and 1 decare for vineyards and orchards.

Practical tips if you are selling

  • Do the numbers before the listing. Check frontage, area, designated use and buildings before advertising "a 400 sq m plot".
  • If a buyer appears before the procedure, tie the preliminary contract to approval of the amendment: a deadline, what happens to the deposit if it is refused, and who pays for the draft and fees.
  • Each new plot must be buildable — with street frontage and access to utilities. A smaller plot also carries less permitted built-up area, which affects the price.
  • Allow real time. The procedure and the cadastre take months; if you are in a hurry, selling the whole plot may be better.

In brief

A physical part of a plot within a settlement can only be sold if it meets the minimum sizes in Article 19 ZUT — in towns, 14 m of frontage and 300 sq m, reducible by up to one fifth. The route runs through an amendment of the regulation plan, the consent of all owners and an update of the cadastre. Parts joined to a neighbouring plot are the exception.

Thinking of splitting and selling your plot? Call us or visit the Scala Di office — we will go through the plan, the measurements and the options with you before the property goes on the market.

This information is general and indicative and is not a substitute for professional advice.

Author

Veni Gospodinova

Veni Gospodinova

Houses & Plots Manager

"There are no unsolvable cases – all it takes is knowledge and perseverance!"