Buying a plot in a village below the mountains, a holiday home by a reservoir or a house with a garden on the plain? There is a good chance the property lies in a Natura 2000 protected zone. According to Bulgaria's Executive Environment Agency (IAOS), at the end of 2022 these zones covered 34.9% of the country.
The good news is that being in a zone does not automatically mean you cannot build. The less good news is that it adds another check, which can change your plans, your timetable and the cost of the project. Here is what to know before you pay.
A protected zone and a protected area are not the same thing
The two terms are often confused, and the rules differ:
- Protected zones (Natura 2000) are designated under the Biological Diversity Act (ZBR) to protect natural habitats and the habitats of species, including birds (Art. 6 ZBR). They usually cover large areas that include villages, farmland and forests.
- Protected areas are designated under the Protected Areas Act – national and nature parks, reserves, protected sites and natural landmarks. According to IAOS, at the end of 2022 there were 1,039 of them, covering 5.27% of the country. Their regimes are usually stricter – in a reserve or a national park the scope for building is very limited.
The two can overlap: a single property can lie both in a Natura 2000 zone and in a nature park. So check both.
Ownership stays with you – and so do the restrictions
Designating a protected zone does not change ownership of the land, forests and water bodies in it (Art. 13 ZBR). It can, however, limit what you do with the property.
The restrictions are set out in the designation order for the specific zone. The law requires the order to list the bans or restrictions on activities that conflict with the conservation objectives (Art. 12 ZBR). They differ from zone to zone. In some zones, for example, ploughing up pastures and meadows or using pesticides and mineral fertilisers on them is banned; in others there are no such bans. Spatial plans must also comply with the order.
The practical takeaway: it is not enough to know that a property is "in Natura". You need to read the order for that particular zone and see what it prohibits.
The compatibility assessment: what it is and when it applies
If you want to build, change the designation of land or have a detailed development plan (PUP) approved in a protected zone, you will most likely go through a compatibility assessment (OS). It is governed by Art. 31 ZBR and by the Ordinance on compatibility assessment (adopted by Council of Ministers Decree No. 201 of 2007).
The ordinance applies to investment proposals that fall wholly or partly within a protected zone, as well as to larger projects subject to an environmental procedure under the Environmental Protection Act, wherever they are (Art. 2). The procedure runs like this:
- Notification. The developer – the owner or buyer who wants to build – notifies the competent authority (usually the regional environment inspectorate, RIOSV) at the earliest stage (Art. 10 of the ordinance), describing what they want to do, where and how.
- Screening. RIOSV assesses the likely degree of impact on the zone using a checklist (Arts. 15–16).
- Decision. If no significant negative impact is likely, the authority issues a decision; the ordinance sets 30 days from notification, provided the file is complete (Art. 18). If an impact is likely, it decides that a full assessment must be carried out (Art. 20) – with an expert report, more time and more cost.
For larger projects that require an environmental impact assessment (EIA), the compatibility assessment is carried out within the EIA procedure (Art. 31(4) ZBR).
The consequences are real: the conditions in the decision are binding, and if RIOSV refuses approval, the project cannot be approved by other authorities. In practice the municipality will not issue a building permit without RIOSV's positive act where one is required.
What it means for different buyers
Buying a plot to build a house. Before you pay a deposit, check whether the plot is in a zone and what the order bans. If it is agricultural land and its designation has to be changed, the RIOSV procedure comes on top of the others. Build the time for it into your schedule.
Buying an existing house or holiday home. Using an existing, lawful building is usually not affected. It matters, however, if you plan an extension, an extra storey, a pool or a new outbuilding – these may need a procedure of their own.
Buying farmland or forest as an investment. The bans in the order (for example on ploughing up meadows and pastures) directly affect how the land can be farmed – and with it the rent and the price.
Selling. If you have a letter or decision from RIOSV for the property, include it in the documents. Buyers will value it because it saves time and uncertainty.
How to check the property
| What | Where | Why |
|---|---|---|
| Is the property in a zone | The Natura 2000 protected zones information system of the Ministry of Environment and Water (natura2000.egov.bg) | map of zones by land plot |
| Bans and restrictions | The zone's designation order | what exactly is prohibited |
| Protected area | IAOS register of protected areas | park, reserve, protected site |
| Past procedures | The seller, the municipality, RIOSV | is there a letter or decision for the property |
| Planning status | The municipality (PUP, sketch) | what the plan allows |
If the property is in a zone and your plans include building, the safest step is to ask RIOSV before you buy, with a short description of what you intend. The answer will tell you whether you face a quick screening or a full assessment.
If the property is on the coast, see also our guide to Balchik and Kavarna, where we covered the Kaliakra and Belite Skali zones and the EU Court of Justice case. If there is no mains sewerage in the area, read what the law allows for a cesspit or a small treatment plant.
In brief
- About 35% of Bulgaria is in Natura 2000 zones. That is not an automatic ban on building.
- Protected zones (ZBR) and protected areas (Protected Areas Act) are different – check both.
- The specific bans are in each zone's designation order.
- Building, a PUP or a change of land designation in a zone usually requires a RIOSV ruling under the compatibility assessment ordinance.
- Ask RIOSV before you pay a deposit.
Thinking of buying a plot or a house in a protected zone? Call us or drop by our office – we will check the property's status together and tell you which steps lie ahead before you sign.
This information is general and indicative and is no substitute for professional advice.